National Carillon, Canberra
Ironbridge provided remedial engineering for the Carillon, repairing heritage concrete and using LiDAR drone mapping to identify, track, and complete every defect on this nationally significant landmark.
State Theatre Centre WA
Structural solutions were delivered for this acoustically isolated, architecturally bold theatre, built on a highly constrained site above rail tunnels and critical infrastructure.
Christ Church Grammar Preparatory School
The preparatory school features a bold feature of lightweight perforated panels, engineered to balance structural efficiency, thermal performance, and architectural expression in a contemporary educational setting.